The subject of reconstruction is the part of Njegoševa Street from Bokeška Street to Bulevar Ivana Crnojevića, 210 m long, which is being transformed into a car-pedestrian zone with a determined time regime of allowed car traffic. The central car-pedestrian corridor is designed to be 5.5 m wide, with sidewalks about 7.0 m wide on both sides.