The demolition of old buildings and the clearing of the site were done. After that, construction and installation works were performed, as well as works on the arrangement of the terrain for two buildings of the floors Po + P + 1. The first building consists of four residential units, the other of two residential units, while both buildings have a parking space in the basement.